Monday, June 30, 2014

Re: [CROMA] Main Load // Monthly Fixed Charges collected and paid by Builder & Installation Charges for Main Load which is yet to be Provided

 

On reversal of excess fixed charges in Mascot, I would like to point that Mahagun might have agreed to reversal verbally however when current MMRWA team followed up on it builder straightaway denied it saying no builder refunds charges so why shall I! He was delaying the issue by just verbally saying that he would think about it on handover of the society to the RWA.

However it was only due to extra efforts and strong stand put in by current MMRWA team and various rounds of discussions with the builder that Mahagun has finally agreed upon refunding the charges.

So the respective RWAs of the other societies needs to take up this with the builders strongly.

Gurpreet Singh
EB Member
MMRWA
Mahagun Mascot
On Mon, 30 Jun 2014 22:53:08 +0530 wrote
>
























Dear All Crossings Republik
Residents/AOA/RWA/Adhoc Committee Members,



CROMA wanted to bring below two
points pertaining to Electricity.

1)      Monthly Fixed Charges being collected
by CIPL

2)      Sanctioned Load of each society
and payment made for this to CIPL and in turn by CIPL to UPPCL.



1) Monthly Fixed Charges
Being Collected by CIPL

All of the Crossings Republik
residents are paying monthly fixed charges for the power connection taken by them.
Currently this is Rs. 75 Per KVA for the load taken by us. However as CIPL is
having limited power load available with them, they are billing to builders on
minimum of sanction and peak load drawn by the society every month. At present
excess monthly fixed charges is going into the pocket of Respective Builder.

For Example, if in any society
in which possession is given for 300 flats, considering 5 KVA load per flat,
Total Load: 300 X 5 KVA = 1500 KVA (This will be higher in many society as many
resident have taken higher power load.)

(A) The fixed charges being
collected by builder: 1500 KVA X Rs. 75/- = Rs. 1,12,500/-

(B) From the Power Load data of
different society, we have found that for 300 flats, the sanctioned power load
/ peak load is less than 500 KVA. Considering 500 as a peak load, the fixed
charges paid by the builder to CIPL is 500 KVA X Rs. 75 = Rs. 37,500/-

(C) The Extra Fixed Charges
collected by the Builders: (A)-(B) = Rs. 75,000 Monthly (Rs. 250 Per Flat)

(D) Now, per flat excess amount
which is going into the pocket of respective builder is: (C)/300= Rs. 250/-

This differential amount should
be either refunded or adjusted out of common expense. In Mahagun Mascot, it was
agreed on Day-1 that the excess amount will be adjusted and now they started refund
to every flat owner who has cleared all dues on a certain timeframe. In Arihant
Ambience society, the same kind of discussion is underway for adjustment of
this excess amount out of common expense. So CROMA is requesting all the
AAO/Adhoc Committee and General Body to take it up with their respective builder
on same line. We, at CROMA is requesting CIPL to share the monthly fixed
charges billed by them to different builders and will share it with you all after
receipt of the same.



2) Sanction Load of each
society and payment made for this to CIPL in turn by CIPL to UPPCL

Currently CIPL is having
sanctioned load of 10 MW (Mega Watt).

We are assuming that possession
has been given to 10,000 flats and power load taken by individual flat owners
are in the range of 3 KVA to 9 KVA. Considering the average power load of 5 KVA,
the total power load sold by the different builders comes around 50000 KVA i.e.
50MW.

As the power load sanctioned is
only 10 MW and it's assumed that the payment has been made only for 10 MW and the
payment of balance 40 MW collected by the builders are either lying with
respective builder or CIPL.

Considering the fact that the
Power connection charges of Rs. 7500/- per KVA collected by the builder (Many
Builder has collected 10,000 or more per KVA for Main Load, which is also
illegal), the total amount collected towards this 40 MW main load connection which is not available
as of now @ 7500/- Per KVA comes around 30 Crs.



We need to find out the power load
sanctioned for every society and the amount collected by CIPL from different
builders. This will help us in following manner:

1)      All the builders are facing
with liquidity crunch and they use the entire funds available with them, if
they will not make provision of it and will spend this amount, there can be
situation when additional power load will be available with CIPL, but sanction
can get delayed due to delay in payment by builders to CIPL

2)      There are already many examples
where builder ran away from the society and residents were required to make
payment again for the facility which was not provided. At present the builder
are having unsold inventory hence they are available here and at later date
when they will move to other projects, it will be very difficult to chase them
and make them pay this amount. This fund should be deposited in a joint account.

3)      The Builders are using these
funds and saving interest for raising fund equivalent to this amount. As of now,
none of the builders are able to raise fund at the rate of less than 13%. Even
if we take interest rate of 9% yearly on this unused 30 Crs, it will be  Rs. 2.70 Crs. Yearly Rs. 22.50 Lacs
Monthly. This amount should be adjusted towards Township Maintenance Charges
(TMC) or any other common expense incurred.

CROMA is requesting respective
AAO / Adhoc Committee to take up this most burning issue with respective
builder ASAP.

In parallel, CROMA is taking up
it with CIPL for collecting sanctioned load; payment collected towards it and
monthly billing of fixed charges by them to different society and will share
the data after receipt from them so that it will be easier to cross check at
your end. If anyone is from Electricity background, please come and join with
CROMA so that your expert guidance can be helpful for the 10000 flat owners of
this township. Please feel free to write us on info@croma.org.in or cromaupdates@gmail.com. We will answer your
concern as soon as possible.

Warm Regards,

Team CROMA

























Get your own FREE website, FREE domain & FREE mobile app with Company email.  
Know More >

__._,_.___

Posted by: "Gurpreet Singh" <gurpreet.kohli@rediffmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (3)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___

Re: [CROMA] Main Load // Monthly Fixed Charges collected and paid by Builder & Installation Charges for Main Load which is yet to be Provided

 

Great work Team Croma. You are indeed working in the interest of residents. What better way to demonstrate that.

I hope the AAOs and/or so called RWAs of different societies also take a leaf out of your book and try and do something similar for the benefit of their societies and residents instead of fighting to stay in power and/or finding new ways of siphoning off funds of flat owners for their personal gains.

Do keep up the good work and continue spreading awareness among us. On our part, we residents should start pressurizing our respective AAOs / RWAs to act on this point.

Thanks

Alok

Sent on my BlackBerry® from Vodafone

From: "CROMA Updates cromaupdates@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA]" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Sender: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Date: Mon, 30 Jun 2014 22:52:57 +0530
To: crossingsrepublikownersandmembersassociation-croma<CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
ReplyTo: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Cc: cromaexecutivebody@googlegroups.com<cromaexecutivebody@googlegroups.com>
Subject: [CROMA] Main Load // Monthly Fixed Charges collected and paid by Builder Installation Charges for Main Load which is yet to be Provided

 

Dear All Crossings Republik Residents/AOA/RWA/Adhoc Committee Members,


CROMA wanted to bring below two points pertaining to Electricity.

1)      Monthly Fixed Charges being collected by CIPL

2)      Sanctioned Load of each society and payment made for this to CIPL and in turn by CIPL to UPPCL.


1) Monthly Fixed Charges Being Collected by CIPL

All of the Crossings Republik residents are paying monthly fixed charges for the power connection taken by them. Currently this is Rs. 75 Per KVA for the load taken by us. However as CIPL is having limited power load available with them, they are billing to builders on minimum of sanction and peak load drawn by the society every month. At present excess monthly fixed charges is going into the pocket of Respective Builder.

For Example, if in any society in which possession is given for 300 flats, considering 5 KVA load per flat, Total Load: 300 X 5 KVA = 1500 KVA (This will be higher in many society as many resident have taken higher power load.)

(A) The fixed charges being collected by builder: 1500 KVA X Rs. 75/- = Rs. 1,12,500/-

(B) From the Power Load data of different society, we have found that for 300 flats, the sanctioned power load / peak load is less than 500 KVA. Considering 500 as a peak load, the fixed charges paid by the builder to CIPL is 500 KVA X Rs. 75 = Rs. 37,500/-

(C) The Extra Fixed Charges collected by the Builders: (A)-(B) = Rs. 75,000 Monthly (Rs. 250 Per Flat)

(D) Now, per flat excess amount which is going into the pocket of respective builder is: (C)/300= Rs. 250/-

This differential amount should be either refunded or adjusted out of common expense. In Mahagun Mascot, it was agreed on Day-1 that the excess amount will be adjusted and now they started refund to every flat owner who has cleared all dues on a certain timeframe. In Arihant Ambience society, the same kind of discussion is underway for adjustment of this excess amount out of common expense. So CROMA is requesting all the AAO/Adhoc Committee and General Body to take it up with their respective builder on same line. We, at CROMA is requesting CIPL to share the monthly fixed charges billed by them to different builders and will share it with you all after receipt of the same.


2) Sanction Load of each society and payment made for this to CIPL & in turn by CIPL to UPPCL

Currently CIPL is having sanctioned load of 10 MW (Mega Watt).

We are assuming that possession has been given to 10,000 flats and power load taken by individual flat owners are in the range of 3 KVA to 9 KVA. Considering the average power load of 5 KVA, the total power load sold by the different builders comes around 50000 KVA i.e. 50MW.

As the power load sanctioned is only 10 MW and it's assumed that the payment has been made only for 10 MW and the payment of balance 40 MW collected by the builders are either lying with respective builder or CIPL.

Considering the fact that the Power connection charges of Rs. 7500/- per KVA collected by the builder (Many Builder has collected 10,000 or more per KVA for Main Load, which is also illegal), the total amount collected towards this 40 MW main load connection which is not available as of now @ 7500/- Per KVA comes around 30 Crs.


We need to find out the power load sanctioned for every society and the amount collected by CIPL from different builders. This will help us in following manner:

1)      All the builders are facing with liquidity crunch and they use the entire funds available with them, if they will not make provision of it and will spend this amount, there can be situation when additional power load will be available with CIPL, but sanction can get delayed due to delay in payment by builders to CIPL

2)      There are already many examples where builder ran away from the society and residents were required to make payment again for the facility which was not provided. At present the builder are having unsold inventory hence they are available here and at later date when they will move to other projects, it will be very difficult to chase them and make them pay this amount. This fund should be deposited in a joint account.

3)      The Builders are using these funds and saving interest for raising fund equivalent to this amount. As of now, none of the builders are able to raise fund at the rate of less than 13%. Even if we take interest rate of 9% yearly on this unused 30 Crs, it will be  Rs. 2.70 Crs. Yearly & Rs. 22.50 Lacs Monthly. This amount should be adjusted towards Township Maintenance Charges (TMC) or any other common expense incurred.

CROMA is requesting respective AAO / Adhoc Committee to take up this most burning issue with respective builder ASAP.

In parallel, CROMA is taking up it with CIPL for collecting sanctioned load; payment collected towards it and monthly billing of fixed charges by them to different society and will share the data after receipt from them so that it will be easier to cross check at your end. If anyone is from Electricity background, please come and join with CROMA so that your expert guidance can be helpful for the 10000 flat owners of this township. Please feel free to write us on info@croma.org.in or cromaupdates@gmail.com. We will answer your concern as soon as possible.

Warm Regards,

Team CROMA

__._,_.___

Posted by: "Alok Agarwala" <agarwala.alok@gmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (2)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___

[CROMA] Main Load // Monthly Fixed Charges collected and paid by Builder & Installation Charges for Main Load which is yet to be Provided

 

Dear All Crossings Republik Residents/AOA/RWA/Adhoc Committee Members,


CROMA wanted to bring below two points pertaining to Electricity.

1)      Monthly Fixed Charges being collected by CIPL

2)      Sanctioned Load of each society and payment made for this to CIPL and in turn by CIPL to UPPCL.


1) Monthly Fixed Charges Being Collected by CIPL

All of the Crossings Republik residents are paying monthly fixed charges for the power connection taken by them. Currently this is Rs. 75 Per KVA for the load taken by us. However as CIPL is having limited power load available with them, they are billing to builders on minimum of sanction and peak load drawn by the society every month. At present excess monthly fixed charges is going into the pocket of Respective Builder.

For Example, if in any society in which possession is given for 300 flats, considering 5 KVA load per flat, Total Load: 300 X 5 KVA = 1500 KVA (This will be higher in many society as many resident have taken higher power load.)

(A) The fixed charges being collected by builder: 1500 KVA X Rs. 75/- = Rs. 1,12,500/-

(B) From the Power Load data of different society, we have found that for 300 flats, the sanctioned power load / peak load is less than 500 KVA. Considering 500 as a peak load, the fixed charges paid by the builder to CIPL is 500 KVA X Rs. 75 = Rs. 37,500/-

(C) The Extra Fixed Charges collected by the Builders: (A)-(B) = Rs. 75,000 Monthly (Rs. 250 Per Flat)

(D) Now, per flat excess amount which is going into the pocket of respective builder is: (C)/300= Rs. 250/-

This differential amount should be either refunded or adjusted out of common expense. In Mahagun Mascot, it was agreed on Day-1 that the excess amount will be adjusted and now they started refund to every flat owner who has cleared all dues on a certain timeframe. In Arihant Ambience society, the same kind of discussion is underway for adjustment of this excess amount out of common expense. So CROMA is requesting all the AAO/Adhoc Committee and General Body to take it up with their respective builder on same line. We, at CROMA is requesting CIPL to share the monthly fixed charges billed by them to different builders and will share it with you all after receipt of the same.


2) Sanction Load of each society and payment made for this to CIPL & in turn by CIPL to UPPCL

Currently CIPL is having sanctioned load of 10 MW (Mega Watt).

We are assuming that possession has been given to 10,000 flats and power load taken by individual flat owners are in the range of 3 KVA to 9 KVA. Considering the average power load of 5 KVA, the total power load sold by the different builders comes around 50000 KVA i.e. 50MW.

As the power load sanctioned is only 10 MW and it's assumed that the payment has been made only for 10 MW and the payment of balance 40 MW collected by the builders are either lying with respective builder or CIPL.

Considering the fact that the Power connection charges of Rs. 7500/- per KVA collected by the builder (Many Builder has collected 10,000 or more per KVA for Main Load, which is also illegal), the total amount collected towards this 40 MW main load connection which is not available as of now @ 7500/- Per KVA comes around 30 Crs.


We need to find out the power load sanctioned for every society and the amount collected by CIPL from different builders. This will help us in following manner:

1)      All the builders are facing with liquidity crunch and they use the entire funds available with them, if they will not make provision of it and will spend this amount, there can be situation when additional power load will be available with CIPL, but sanction can get delayed due to delay in payment by builders to CIPL

2)      There are already many examples where builder ran away from the society and residents were required to make payment again for the facility which was not provided. At present the builder are having unsold inventory hence they are available here and at later date when they will move to other projects, it will be very difficult to chase them and make them pay this amount. This fund should be deposited in a joint account.

3)      The Builders are using these funds and saving interest for raising fund equivalent to this amount. As of now, none of the builders are able to raise fund at the rate of less than 13%. Even if we take interest rate of 9% yearly on this unused 30 Crs, it will be  Rs. 2.70 Crs. Yearly & Rs. 22.50 Lacs Monthly. This amount should be adjusted towards Township Maintenance Charges (TMC) or any other common expense incurred.

CROMA is requesting respective AAO / Adhoc Committee to take up this most burning issue with respective builder ASAP.

In parallel, CROMA is taking up it with CIPL for collecting sanctioned load; payment collected towards it and monthly billing of fixed charges by them to different society and will share the data after receipt from them so that it will be easier to cross check at your end. If anyone is from Electricity background, please come and join with CROMA so that your expert guidance can be helpful for the 10000 flat owners of this township. Please feel free to write us on info@croma.org.in or cromaupdates@gmail.com. We will answer your concern as soon as possible.

Warm Regards,

Team CROMA

__._,_.___

Posted by: CROMA Updates <cromaupdates@gmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (1)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___

Sunday, June 29, 2014

[CROMA] 2 BHK flat available on 1 Aug 2014 rent 11K

 

Hi All,

2BHK semi-furnished flat available on 1Aug 2014 at 2nd Floor @ Crossing Republik.
 
Few specifications are stated below:
-  super Area - 1270 sqft:
- 2 Bedrooms  + 1 Living cum Dining Room + 2 Bathrooms + 1 Kitchen + 3 Balconies
- 1  Car Parking
- 1 KVA Power Backup
- Iron Gate installed at home main entry
- Utility balcony kitchen side 
- Almirah in Room
- woodwork done in Kitchen
- RO installed in Kitchen
- Samsung 1 Ton window A/C installed in one bedroom
- Ceiling Fans installed 
- Curtain Rods installed
- Club / Gym available in society.

Expected RENT: Rs 11000 per month + 2 months refundable security deposit
Electricity and Maintenance are prepaid and to be borne by tenant from the date of agreement

Slightly Negotiable, looking for good tenant who will maintain the house.

Broker excuse !
 
Please contact undersigned on email /cell please, if interested.

Interested to give Bachelors/family.

Rahul

__._,_.___

Posted by: Rahul Rahulanker <rrahulanker@gmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (1)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___

Re: [CROMA] Want 2 bhk on rent

 

Hi All,

There is an requirement of cab (mahindra xylo like) which can accomodate 6 passengers person on my office route. Starting point in Rajnagar, Ghaziabad via Crossing Republik, Ghaziabad to NSEZ, NOida Phase II. The running would be 40 kms approx on one side. Pickup is at 7:30 am in mornin reaching office at 9:00 am. On return we start-off at 5:30 pm from Office.

If any one doing this cab business then please contact me at my cell no. earliest.


HIMANSHU KARKI
(+91-9818302558)


On Sun, Jun 29, 2014 at 3:21 PM, Amit Malik santushtincr@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in> wrote:
 



Dear all,

The one of my friends want 2 bhk on rent in crossing republic .The apartment is may be fully furnished or wooden work completed Interested person can call me or write me with all detail.


Thanks and Regard's :
Amit Malik
Contact-08527199215  


__._,_.___

Posted by: himanshu karki <himanshukarki@gmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (2)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___

[CROMA] Want 2 bhk on rent

 



Dear all,

The one of my friends want 2 bhk on rent in crossing republic .The apartment is may be fully furnished or wooden work completed Interested person can call me or write me with all detail.


Thanks and Regard's :
Amit Malik
Contact-08527199215  

__._,_.___

Posted by: Amit Malik <santushtincr@gmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (1)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___

Re: [CROMA] Fwd: Break Down at RMU of Arihant causing disruption of Supply to Feeder 4

 

Hi All,

Is this the reason for exotica as well,
As we are facing very power cuts. Power got restored at 12:30pm today . We were on back up whole night. Please communicate the reason 

Thanks.


On Jun 29, 2014, at 1:14 PM, "Manmohan Jha manmohan.jha@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA]" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in> wrote:

 

Fyi

---------- Forwarded message ----------
From: "Manmohan Jha" <manmohan.jha@gmail.com>
Date: 29 Jun 2014 11:01
Subject: Break Down at RMU of Arihant causing disruption of Supply to Feeder 4
To: "cromaexecutivebody@googlegroups.com" <cromaexecutivebody@googlegroups.com>
Cc: "Xing-Future@googlegroups.com" <Xing-future@googlegroups.com>

As explined it atatched message form CIPL, Due to low level of Gas in RMU of Arihant this problem has happened. Problem happened at 2 AM in night and came in notice at 5.30 in morning. By early petrolling by CIPL it could have come in notice bit early.

There is no provision of cutting / bypassing line of any one society. This is required to be done manually and same is on process since morning 6 when it came in notice of CIPL.

As work is going on this line and there is no provision of disconnecting line of only one society, power is off for complete feeder 4. Now bypass work is almost complete and power of all the society except Arihant will be on soon.

Issue with RMU of Arihant came in notice of CIPL 4 days back, they should have done this connection at that time only till gas was refilledso that Arihant maintenance team should have been forced to do corrective action.

In future for any similar case with any society power of that siciety need to be disconnected with notice of 4 hour so hat maintenance of that society will act fast.

Further provision need to be made so that for doing this type of maintenance work power of only 2-3 society gets disrupted instead of 2/3 of township.


Regards,

Manmohan Jha



On Sat, Jun 28, 2014 at 10:07 PM, Parveen Joshi <ajprav@gmail.com> wrote:
Yes they have provision and it can be done.
Joshi
Sent from my iPad

> On 28-Jun-2014, at 9:27 pm, Manish <manishsmooth@gmail.com> wrote:
>
> I think - if the problem took palce in any particular society, there
> must be provision to stop and remove supply to that society and
> restore power to other societies.
>
>> On 6/29/14, Sanjay Kr Jha <sanjaykrjha@gmail.com> wrote:
>>
>>
>> While Arihant residents disagree on the CIPL notice. Rest, they can
>> comment.
>>
>>
>> Sent from my iPhone
>>
>>> On 29-Jun-2014, at 9:17, Alok Gupta <alok.gupta.mca@gmail.com> wrote:
>>>
>>> Saviour is also running on backup since yesterday, as I heard, there
>>> are 3 lines, out of which 1 is down most of the times & that one line
>>> have GGV/Saviour.
>>>
>>>> On 6/29/14, Manish <manishsmooth@gmail.com> wrote:
>>>> Its ridiculous now.
>>>> GGV is again on back-up since yesterday night, while the mains is
>>>> available from UPPCL
>>>> Is there any way out?
>>>>
>>>> Manish
>>>> GGV
>>>>
>>>> --
>>>> Regards,
>>>> Manish
>>>>
>>>> --
>>>> You received this message because you are subscribed to the Google
>>>> Groups
>>>> "Xing-Future" group.
>>>> To unsubscribe from this group and stop receiving emails from it, send
>>>> an
>>>> email to Xing-Future+unsubscribe@googlegroups.com.
>>>> To post to this group, send email to Xing-Future@googlegroups.com.
>>>> To view this discussion on the web visit
>>>> https://groups.google.com/d/msgid/Xing-Future/CAD%2BJhXX%2BO4DFUeNCFWL-S147O6QduZLYOwbhAhiy79B96m%3Dh5w%40mail.gmail.com.
>>>> For more options, visit https://groups.google.com/d/optout.
>>>
>>>
>>> --
>>> Regards,
>>> Alok Gupta
>>> +91-9811323527
>>> http://about.me/guptaalok
>>>
>>> --
>>> You received this message because you are subscribed to the Google Groups
>>> "Xing-Future" group.
>>> To unsubscribe from this group and stop receiving emails from it, send an
>>> email to Xing-Future+unsubscribe@googlegroups.com.
>>> To post to this group, send email to Xing-Future@googlegroups.com.
>>> To view this discussion on the web visit
>>> https://groups.google.com/d/msgid/Xing-Future/CAPUDASgfM%3D-nbNdTRg2jVAhUK2HgubyBwE%3D8Wd9%2Bz8Zt7qGVDQ%40mail.gmail.com.
>>> For more options, visit https://groups.google.com/d/optout.
>>
>> --
>> You received this message because you are subscribed to the Google Groups
>> "ggv.parivar" group.
>> To unsubscribe from this group and stop receiving emails from it, send an
>> email to ggvparivar+unsubscribe@googlegroups.com.
>> For more options, visit https://groups.google.com/d/optout.
>
>
> --
> Regards,
> Manish
>
> --
> You received this message because you are subscribed to the Google Groups "Xing-Future" group.
> To unsubscribe from this group and stop receiving emails from it, send an email to Xing-Future+unsubscribe@googlegroups.com.
> To post to this group, send email to Xing-Future@googlegroups.com.
> To view this discussion on the web visit https://groups.google.com/d/msgid/Xing-Future/CAD%2BJhXX7FdiK%3DfDOT%2B_ebFTD3LWNUBL6_PkXeerqg5o%2BymUu3w%40mail.gmail.com.
> For more options, visit https://groups.google.com/d/optout.

--
You received this message because you are subscribed to the Google Groups "Xing-Future" group.
To unsubscribe from this group and stop receiving emails from it, send an email to Xing-Future+unsubscribe@googlegroups.com.
To post to this group, send email to Xing-Future@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/Xing-Future/11F04073-3467-4D7B-80C5-FC84F5F6D3C6%40gmail.com.
For more options, visit https://groups.google.com/d/optout.

<image.jpeg>

__._,_.___

Posted by: Arpan <arpan2ulove@gmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (2)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___

[CROMA] Fwd: Break Down at RMU of Arihant causing disruption of Supply to Feeder 4

 

Fyi

---------- Forwarded message ----------
From: "Manmohan Jha" <manmohan.jha@gmail.com>
Date: 29 Jun 2014 11:01
Subject: Break Down at RMU of Arihant causing disruption of Supply to Feeder 4
To: "cromaexecutivebody@googlegroups.com" <cromaexecutivebody@googlegroups.com>
Cc: "Xing-Future@googlegroups.com" <Xing-future@googlegroups.com>

As explined it atatched message form CIPL, Due to low level of Gas in RMU of Arihant this problem has happened. Problem happened at 2 AM in night and came in notice at 5.30 in morning. By early petrolling by CIPL it could have come in notice bit early.

There is no provision of cutting / bypassing line of any one society. This is required to be done manually and same is on process since morning 6 when it came in notice of CIPL.

As work is going on this line and there is no provision of disconnecting line of only one society, power is off for complete feeder 4. Now bypass work is almost complete and power of all the society except Arihant will be on soon.

Issue with RMU of Arihant came in notice of CIPL 4 days back, they should have done this connection at that time only till gas was refilledso that Arihant maintenance team should have been forced to do corrective action.

In future for any similar case with any society power of that siciety need to be disconnected with notice of 4 hour so hat maintenance of that society will act fast.

Further provision need to be made so that for doing this type of maintenance work power of only 2-3 society gets disrupted instead of 2/3 of township.


Regards,

Manmohan Jha



On Sat, Jun 28, 2014 at 10:07 PM, Parveen Joshi <ajprav@gmail.com> wrote:
Yes they have provision and it can be done.
Joshi
Sent from my iPad

> On 28-Jun-2014, at 9:27 pm, Manish <manishsmooth@gmail.com> wrote:
>
> I think - if the problem took palce in any particular society, there
> must be provision to stop and remove supply to that society and
> restore power to other societies.
>
>> On 6/29/14, Sanjay Kr Jha <sanjaykrjha@gmail.com> wrote:
>>
>>
>> While Arihant residents disagree on the CIPL notice. Rest, they can
>> comment.
>>
>>
>> Sent from my iPhone
>>
>>> On 29-Jun-2014, at 9:17, Alok Gupta <alok.gupta.mca@gmail.com> wrote:
>>>
>>> Saviour is also running on backup since yesterday, as I heard, there
>>> are 3 lines, out of which 1 is down most of the times & that one line
>>> have GGV/Saviour.
>>>
>>>> On 6/29/14, Manish <manishsmooth@gmail.com> wrote:
>>>> Its ridiculous now.
>>>> GGV is again on back-up since yesterday night, while the mains is
>>>> available from UPPCL
>>>> Is there any way out?
>>>>
>>>> Manish
>>>> GGV
>>>>
>>>> --
>>>> Regards,
>>>> Manish
>>>>
>>>> --
>>>> You received this message because you are subscribed to the Google
>>>> Groups
>>>> "Xing-Future" group.
>>>> To unsubscribe from this group and stop receiving emails from it, send
>>>> an
>>>> email to Xing-Future+unsubscribe@googlegroups.com.
>>>> To post to this group, send email to Xing-Future@googlegroups.com.
>>>> To view this discussion on the web visit
>>>> https://groups.google.com/d/msgid/Xing-Future/CAD%2BJhXX%2BO4DFUeNCFWL-S147O6QduZLYOwbhAhiy79B96m%3Dh5w%40mail.gmail.com.
>>>> For more options, visit https://groups.google.com/d/optout.
>>>
>>>
>>> --
>>> Regards,
>>> Alok Gupta
>>> +91-9811323527
>>> http://about.me/guptaalok
>>>
>>> --
>>> You received this message because you are subscribed to the Google Groups
>>> "Xing-Future" group.
>>> To unsubscribe from this group and stop receiving emails from it, send an
>>> email to Xing-Future+unsubscribe@googlegroups.com.
>>> To post to this group, send email to Xing-Future@googlegroups.com.
>>> To view this discussion on the web visit
>>> https://groups.google.com/d/msgid/Xing-Future/CAPUDASgfM%3D-nbNdTRg2jVAhUK2HgubyBwE%3D8Wd9%2Bz8Zt7qGVDQ%40mail.gmail.com.
>>> For more options, visit https://groups.google.com/d/optout.
>>
>> --
>> You received this message because you are subscribed to the Google Groups
>> "ggv.parivar" group.
>> To unsubscribe from this group and stop receiving emails from it, send an
>> email to ggvparivar+unsubscribe@googlegroups.com.
>> For more options, visit https://groups.google.com/d/optout.
>
>
> --
> Regards,
> Manish
>
> --
> You received this message because you are subscribed to the Google Groups "Xing-Future" group.
> To unsubscribe from this group and stop receiving emails from it, send an email to Xing-Future+unsubscribe@googlegroups.com.
> To post to this group, send email to Xing-Future@googlegroups.com.
> To view this discussion on the web visit https://groups.google.com/d/msgid/Xing-Future/CAD%2BJhXX7FdiK%3DfDOT%2B_ebFTD3LWNUBL6_PkXeerqg5o%2BymUu3w%40mail.gmail.com.
> For more options, visit https://groups.google.com/d/optout.

--
You received this message because you are subscribed to the Google Groups "Xing-Future" group.
To unsubscribe from this group and stop receiving emails from it, send an email to Xing-Future+unsubscribe@googlegroups.com.
To post to this group, send email to Xing-Future@googlegroups.com.
To view this discussion on the web visit https://groups.google.com/d/msgid/Xing-Future/11F04073-3467-4D7B-80C5-FC84F5F6D3C6%40gmail.com.
For more options, visit https://groups.google.com/d/optout.

__._,_.___

Posted by: Manmohan Jha <manmohan.jha@gmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (1)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___