Great Effort by all to get the issues resolved.
The Indane gas depot is virtually a ticking bomb. Any mishap could
lead to catastrophic concequencies. Great point bought ou by Vishalji.
This agency should be relocated to a safer place at the earliest.
Best Regards,
Sunil Bhargava
Mobile: +91 9971477499
On Mon, Dec 22, 2014 at 2:59 PM, CROMA Updates <cromaupdates@gmail.com> wrote:
> Dear all residents of Crossings Republik/AOA Office Bearers/CROMA Members,
>
> I would like to thank all those members who took time off to attend this
> meeting on 22nd Dec 2014 with reference to the letter issued by CIPL dated
> 15th Dec 2014 to every society that they are clubbing Township Maintenance
> Charges (TMC) and Electricity of every society and threatening that if the
> society will not pay the TMC Charges then the Electricity of that society
> will be disconnected immediately. Accordingly CIPL Management has refused
> accepting the Electricity Bills from Arihant Ambience Society RWA/AOA. On
> this issue, the Arihant AOA Team led by Mr. Vinod Daftari met with DM,
> Ghaziabad (Mr. Vimal Sharma) on 20th Dec 2014 and he forwarded this matter
> to the Secretary of GDA, Mr. Ravindra Godbole to further call a meeting on
> Monday dated 22nd Dec 2014 with the residents and CIPL and close this matter
> ASAP. Accordingly Mr. R. K. Jaiswal – Executive Engineer, Zone-5 as well as
> Mr. Anant Ram Rahi, Asst. Engineer, GDA Zone-5 has been instructed to take
> necessary action on the same to close this issue ASAP. Today, Mr. Rahi and
> Mr. Singh visited at Crossing Infrastructure office at 11:30 AM and the
> issues were discussed on the above subject. Here are the points discussed
> and agreed among the team.
>
> 1) During our meeting, CROMA and AOA Members conveyed this message and
> put the previous correspondence and relevant papers on the table that in
> past, ADM-City and GDA Vice Chairman strictly instructed CIPL Management
> that Township Maintenance Charges (TMC) cannot be clubbed with Electricity
> Charges. So there is no way for refusing accepting the Electricity Payment
> of every society. (Please find the enclosed attachment as previous
> correspondence in this regard.)
>
> 2) During the meeting, Mr. Rahi instructed GM-City, Mr. Sanjeev Sinha
> that electricity in any society should not be disconnected in any situation.
> It is a criminal offence and a basic need to survive in the multi-storied
> building. He also instructed to accept the Electricity Cheque from every
> society.
>
> 3) For Township Maintenance Charges, CROMA strictly conveyed the message
> to them that until and unless our priority issues (such of shortage of
> Sanctioned Power Supply, Road Connectivity, Fire Station, Hospital, Visitor
> Parking Space, Uniform Electricity Rate for Main Power Supply as per UP
> Govt. prescribed rate, provision of Ganga Water, Boundry wall around
> Township etc.) will not be addressed, none of the society will pay a single
> rupee for the same to CIPL. Mr. Rahi instructed GM-City to sit with CROMA
> and other AOA Office Bearers within 7 days and close this matter and keep
> GDA updated with the status. Further meeting can be called, if any
> grievances will be there.
>
> 4) Moreover while discussion with GDA official; we came to know that
> GH-6 compounding has not been done by GDA yet. Due to this GDA is not able
> to issue the Completion Certificate for any of the society in Crossings
> Republik. Mr. Rahi also told us that he is planning to issue Part Completion
> Certificate for those societies whose compounding will be done.
>
> 5) Mr. Vishal Aery, President, CROMA informed GDA officials to get the
> information on removal of Indane Gas Agency from the township and Mr. Rahi
> confirmed that some meeting with CIPL, GDA and Khwaja Garib Nawaz Indane Gas
> Agency is already going on and they are planning to shift it to another
> location. CIPL will keep CROMA updated with the status on the same.
>
> 6) Mr. Rahi also told CIPL official that a PR System should be set up to
> acknowledge the complaint and common issues and can be tracked it
> accordingly for the ease of communication with residents. It was also agreed
> that the CIPL Management will share the Calculation of City Maintenance
> Expenses of Township with CROMA and other AOA/RWA and will pursue to stop
> unauthorized construction in Plot No GH-6.
>
>
>
> Note: CROMA wanted to say thanks to the Team of Arihant Ambience RWA/AOA
> members for taking up this issue which is affecting the whole Crossings
> Republik society.
>
>
>
> Warm Regards,
>
> Raj Kumar Raju
>
> (General Secretary, CROMA)
>
> --
> You received this message because you are subscribed to the Google Groups
> "Arihant Ambience RWA" group.
> To unsubscribe from this group and stop receiving emails from it, send an
> email to Arihant_Ambience+unsubscribe@googlegroups.com.
> To post to this group, send email to Arihant_Ambience@googlegroups.com.
> Visit this group at http://groups.google.com/group/Arihant_Ambience.
> For more options, visit https://groups.google.com/d/optout.
Posted by: Sunil Bhargava <sunilbhargava1@gmail.com>
Reply via web post | • | Reply to sender | • | Reply to group | • | Start a new topic | • | Messages in this topic (2) |
http://www.croma.org.in