Monday, July 20, 2015

RE: [CROMA] Re: [Xing] Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik

 

Dear Sirs,
 
You are requested to look up into given below matters.
Daily, we are facing jam and now it is worst due to rain.
 
 
Regards,
NIranjan Kumar
Cosmos Golden Heights
Crossing Republik, Ghaziabad
 
 

To: authority@gnida.in; dmgha@nic.in; upgha@nic.in; Xing-Future@googlegroups.com; crossings-republik@yahoogroups.com; upgbn@nic.in; cmup@nic.in; helplinegda@gmail.com; CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
From: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Date: Fri, 17 Jul 2015 11:13:08 +0530
Subject: Fwd: [CROMA] Re: [Xing] Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik

 

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

O. P. Parashar
Crossings Republik
Ghaziabad



----------
From: Anurag Jain jainanurag18@yahoo.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 5:05 PM
To: "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>
Cc: "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, "helplinegda@gmail.com" <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>, "CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, "crossings-republik@yahoogroups.com" <crossings-republik@yahoogroups.com>, "Xing-Future@googlegroups.com" <Xing-Future@googlegroups.com>


 


Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad Crossings Republik towards Greater Noida Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time money but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

Anurag Jain
Crossings Republik
Ghaziabad



----------
From: Tarique Khan tarique.ayman@yahoo.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 5:25 PM
To: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in, "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>
Cc: "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, "helplinegda@gmail.com" <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>, "crossings-republik@yahoogroups.com" <crossings-republik@yahoogroups.com>


Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida
Extension Passing through Crossings Republik & Sahberi Village. This
road is a lifeline for commuter travelling from Ghaziabad & Crossings
Republik towards Greater Noida & Noida and vice versa. Further Crossings
Republik where approx. 10000 -12000 family lives has only two exit point
one through NH 24 & another through Sahberi/Noida Extension. Thousands
of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of
vehicles using this link road from Ghaziabad Town & Noida is double than
vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this
work but we have been told that Sahberi Village falls under jurisdiction
of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at
some places encroached. Apart from this condition of road is very poor
and repeatedly big pot holes comes up on this road. After long follow up
by few residents including Mr. Amod Kumar Giri of Crossings Republik
work of widening started and also pot holes were filled up approx. 3
month back. However widening work stopped in between after preliminary
preparation and was not completed. Also of repairing was so poor that
just after one rain bigger pot holes has come up and its nightmare for
thousands of people passing this 200 mtr. Stretch as it takes hours to
cross this patch.

The bad shape of road through this stretch is not only causing personal
loss like health, mental stress, wastage of time & money  but also
causing national loss by wastage of fuel. At times travelling through
this stretch of 200 mtr. takes more than hour and frustrated commuter
starts taking internal routes going through village and township which
is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the
concerned department to look into this and arrange for widening and
repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

Mohd Tarique alam Khan
Paramount, Crossings Republik
Ghaziabad



------------------------------------

------------------------------------

For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]
------------------------------------

Yahoo Groups Links

<*> To visit your group on the web, go to:
    http://in.groups.yahoo.com/group/CrossingsRepublikOwnersAndMembersAssociation-CROMA/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://in.groups.yahoo.com/group/CrossingsRepublikOwnersAndMembersAssociation-CROMA/join
    (Yahoo! ID required)

<*> To change settings via email:
    CrossingsRepublikOwnersAndMembersAssociation-CROMA-digest@yahoogroups.co.in
    CrossingsRepublikOwnersAndMembersAssociation-CROMA-fullfeatured@yahoogroups.co.in

<*> To unsubscribe from this group, send an email to:
    CrossingsRepublikOwnersAndMembersAssociation-CROMA-unsubscribe@yahoogroups.co.in

<*> Your use of Yahoo Groups is subject to:
    https://info.yahoo.com/legal/in/yahoo/utos/terms/


----------
From: anay pathak pathakanay@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 5:38 PM
To: "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>
Cc: "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, "helplinegda@gmail.com" <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>


 

Respected Sir/Madam,
Anay Pathak
Gardenia Square
Crossings Republik
Ghaziabad.



----------
From: Rupesh Nidhi rupesh2904@yahoo.co.in [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 5:38 PM
To: "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>
Cc: "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, "helplinegda@gmail.com" <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>, "crossings-republik@yahoogroups.com" <crossings-republik@yahoogroups.com>, "CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>


 





Rupesh
Exotica Eastern Court, Crossings Republik

Ghaziabad




------------------------------------

------------------------------------






----------
From: Ritesh Agarwal ritesh_iit2003@yahoo.co.in [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 5:45 PM
To: "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>
Cc: "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, "helplinegda@gmail.com" <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>, "CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>


 

 
 
Ritesh Agarwal
Mahagun Mascot
Crossings Republik
Ghaziabad.




.





----------
From: Rajesh Bansal rajesh.bansal20jan@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 6:01 PM
To: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Cc: authority@gnida.in, upgbn@nic.in, dmgha@nic.in, cmup@nic.in, helplinegda <helplinegda@gmail.com>, upgha@nic.in, CRIS <crossings-republik@yahoogroups.com>, Xing-Future@googlegroups.com


 

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

Rajesh Kumar
Crossings Republik
Ghaziabad


On Wed, Jul 8, 2015 at 2:34 PM, Manmohan Jha manmohan.jha@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in> wrote:
 

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

Manmohan Jha
Crossings Republik
Ghaziabad





----------
From: Kshitij Mathur k.mathur@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 6:58 PM
To: authority@gnida.in, upgbn@nic.in, dmgha@nic.in, cmup@nic.in, helplinegda <helplinegda@gmail.com>, upgha@nic.in, CRIS <crossings-republik@yahoogroups.com>, Xing-Future@googlegroups.com
Cc: crossingsrepublikownersandmembersassociation-croma <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>


 

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.


Regards,
Kshitij Mathur
Assotech The Nest


----------
From: 'Mohit singh' mohitsingh1975@rediffmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 8:14 PM
To: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Cc: authority@gnida.in, upgbn@nic.in, dmgha@nic.in, cmup@nic.in, helplinegda <helplinegda@gmail.com>, upgha@nic.in, CRIS <crossings-republik@yahoogroups.com>, Xing-Future@googlegroups.com


 

Dear Sirs,
We the residents of Crossing Republik(around 50,000 in nos.) request urgent action from your good offices to widen the Shahberi link road which is under Greater Noida jurisdiction thereby bringing immediate relief to us and thousands of transit passengers of Ghaziabad and Western Uttar Pradesh.

Looking forward to your prompt action in this matter.

hopefull residents of Crossing Republik (Uttar Pradesh)
Mohit Kumar Singh
9873926636


Sent from RediffmailNG on Android

From: "Kshitij Mathur k.mathur@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA]"CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Sent:Wed, 08 Jul 2015 18:58:44 +0530
To: authority@gnida.in, upgbn@nic.in, dmgha@nic.in, cmup@nic.in, helplinegda helplinegda@gmail.com, upgha@nic.in, CRIS crossings-republik@yahoogroups.com, Xing-Future@googlegroups.com
Cc: "crossingsrepublikownersandmembersassociation-croma"CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Subject: [CROMA] Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village &amp; Crossings Republik

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.


>
Regards,
>Kshitij Mathur
Assotech The Nest


Get your own FREE website, FREE domain & FREE mobile app with Company email.  
Know More >


----------
From: Praveen Antal pkantal@yahoo.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 8, 2015 at 9:46 PM
To: "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>, "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, helplinegda <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>
Cc: CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, "Xing-future@googlegroups.com" <Xing-future@googlegroups.com>, CR <crossings-republik@yahoogroups.com>


 



Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.


Thanks & Regards,

Praveen Antal

Saviour GreenISLE 

Crossing Republic



--
You received this message because you are subscribed to the Google Groups "Xing-Future" group.
To unsubscribe from this group and stop receiving emails from it, send an email to Xing-Future+unsubscribe@googlegroups.com.
To post to this group, send email to Xing-Future@googlegroups.com.
Visit this group at http://groups.google.com/group/Xing-Future.
To view this discussion on the web visit https://groups.google.com/d/msgid/Xing-Future/CANYbw2c6hUjebm7JRAf0H%3DypZAaVTByLiGFFvOUOAjXLPTn%2BYw%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.


----------
From: 'Tushar ........' khare.tushar@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Thu, Jul 9, 2015 at 8:40 AM
To: "CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Cc: "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>, "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, "helplinegda@gmail.com" <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>, "crossings-republik@yahoogroups.com" <crossings-republik@yahoogroups.com>


 

Hello Sir

 
Regards, 
Tushar Khare



----------
From: kumarmanish_1999@yahoo.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Thu, Jul 9, 2015 at 9:39 AM
To: crossings-republik@yahoogroups.com, "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>, "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, helplinegda <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>
Cc: CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, "Xing-future@googlegroups.com" <Xing-future@googlegroups.com>


 
Dear Sirs,‬

‪This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.‬

‪On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.‬

‪This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.‬

‪The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.‬

‪We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.‬

‪We look forward for any early action on ground.‬





‪Thanks & Regards,‬
‪Manish Kumar

‪Proview Laboni ‬

‪Crossing Republik


Sent from BlackBerry® on Airtel

----------
From: Manmohan Jha manmohan.jha@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Thu, Jul 9, 2015 at 11:04 AM
To: DIO NIC Ghaziabad <upgha@nic.in>
Cc: Xing-future@googlegroups.com, CRIS <crossings-republik@yahoogroups.com>, CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, Lalit Sharma <mrlalit1985@gmail.com>


 

Dear Sir,

We regret the inconvenience caused however this is the mail id we have got from website.

You can understand the pain we all facing.

Requeat you to forward the mail to concerned department and also share the mail id of DM office of Ghaziabad and Gautam Buddha Nagar so that we can send reminders to them instead of boyhering you.

Regards

Manmohan Jha

On 9 Jul 2015 10:54, "DIO NIC Ghaziabad" <upgha@nic.in> wrote:
I do not know why these mails are coming to my mailbox.
upgha@nic.in is exclusive for http://www.ghaziabad.nic.in problems/suggestions only IT related activities.
 
DIO
NIC-GZB 
 
----- Original Message -----
Sent: Thursday, July 09, 2015 6:53 AM
Subject: Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik



Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Thanks & Regards,

Lalit Sharma


Crossing Republic




--
You received this message because you are subscribed to the Google Groups "Xing-Future" group.
To unsubscribe from this group and stop receiving emails from it, send an email to Xing-Future+unsubscribe@googlegroups.com.
To post to this group, send email to Xing-Future@googlegroups.com.
Visit this group at http://groups.google.com/group/Xing-Future.
To view this discussion on the web visit https://groups.google.com/d/msgid/Xing-Future/9CEF7BC2B8D44BE59B18425114DDC88F%40nicmail.
For more options, visit https://groups.google.com/d/optout.


----------
From: Manmohan Jha manmohan.jha@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Thu, Jul 9, 2015 at 11:35 AM
To: dmgbn@nic.in, ceo@gnida.in
Cc: Xing-Future@googlegroups.com, CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, CRIS <crossings-republik@yahoogroups.com>


 

Dear Sir,

Request you to look into below matter pertaing to Sahberi Road, Gr. Noida.

Thanks n Regards

Manmohan Jha
Crossings Republik
Ghaziabad

---------- Forwarded message ----------
From: "Manmohan Jha" <manmohan.jha@gmail.com>
Date: 8 Jul 2015 14:30
Subject: Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik
To: <authority@gnida.in>
Cc: "helplinegda" <helplinegda@gmail.com>, <cmup@nic.in>, <dmgha@nic.in>

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis t avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

Manmohan Jha
Crossings Republik
Ghaziabad



----------
From: 'N Ahuja' nkahuja1@rediffmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Thu, Jul 9, 2015 at 3:41 PM
To: "kumarmanish_1999@yahoo.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA]" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Cc: "crossings-republik@yahoogroups.com" <crossings-republik@yahoogroups.com>, "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>, "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, helplinegda <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>, "Xing-future@googlegroups.com" <Xing-future@googlegroups.com>


 
Dear Sir,
Subject: [CROMA] [Xing] Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik
 
Dear Sirs,‬

‪This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.‬

‪On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.‬

‪This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.‬

‪The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.‬

‪We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.‬

‪We look forward for any early action on ground.‬





‪Thanks & Regards,‬


‪Narendra Kumar Ahuja
Ajnara Gen x ‬

‪Crossing Republik

Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (12)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]
Privacy • Unsubscribe • Terms of Use

.

Get your own FREE website, FREE domain & FREE mobile app with Company email.  
Know More >


----------
From: Vidya Nand Rai vidya.rai@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Fri, Jul 10, 2015 at 10:22 AM
To: dmgbn@nic.in, ceo@gnida.in
Cc: "Xing-Future@googlegroups.com" <Xing-Future@googlegroups.com>, CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, CRIS <crossings-republik@yahoogroups.com>


 

Dear Sir,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. 

Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing so that we will get relief from daily pain.

We look forward for support.

Thanks & Regards

Vidya Nand Rai

Crossing Republik 

Ghaziabad



On Thu, Jul 9, 2015 at 11:35 AM, Manmohan Jha <manmohan.jha@gmail.com> wrote:

Dear Sir,

Request you to look into below matter pertaing to Sahberi Road, Gr. Noida.

Thanks n Regards

Manmohan Jha
Crossings Republik
Ghaziabad

---------- Forwarded message ----------
From: "Manmohan Jha" <manmohan.jha@gmail.com>
Date: 8 Jul 2015 14:30
Subject: Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik
To: <authority@gnida.in>
Cc: "helplinegda" <helplinegda@gmail.com>, <cmup@nic.in>, <dmgha@nic.in>

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis t avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

Manmohan Jha
Crossings Republik
Ghaziabad


--
You received this message because you are subscribed to the Google Groups "Xing-Future" group.
To unsubscribe from this group and stop receiving emails from it, send an email to Xing-Future+unsubscribe@googlegroups.com.
To post to this group, send email to Xing-Future@googlegroups.com.
Visit this group at http://groups.google.com/group/Xing-Future.
To view this discussion on the web visit https://groups.google.com/d/msgid/Xing-Future/CAGi4rbdrePqhTe_1EvZiDDX2922e%3Dd0aLTdUFgngnv%3DLx_VR2g%40mail.gmail.com.

For more options, visit https://groups.google.com/d/optout.



----------
From: 'Paras Nigam' paras.nigam@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Fri, Jul 10, 2015 at 11:10 AM
To: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in, dmgbn@nic.in, ceo@gnida.in
Cc: Xing-Future@googlegroups.com, CRIS <crossings-republik@yahoogroups.com>


 

 

Dear Sir,

 

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. 

 

Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

 

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing so that we will get relief from daily pain.

We look forward for support.

 

Regards

Paras Nigam

Crossings Republik 

Ghaziabad

 



----------
From: dewat ram Nakipuria drnakipuria@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Fri, Jul 10, 2015 at 12:40 PM
To: CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Cc: authority@gnida.in, upgbn@nic.in, "dmgha@nic.in" <dmgha@nic.in>, cmup@nic.in, helplinegda <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>, CRIS <crossings-republik@yahoogroups.com>, Xing-Future@googlegroups.com


 

Dear Sirs,

FOLLOWING REQUEST SENT BY CROMA IS VERY ESSENTAIL AND SHOULD BE EXECUTED ON PRIORITY BASIS,LIFE APPEARS VERY DIFFICULT BEING AT CROSSING AS BEING SENIOR PHYSICIAN ME AND MY WIFE DR RANJU NAKIPURIA ,GYNAECOLOGIST AND MANY OTHER DOCTORS PRACTSING IN THESE HOSPITALS AND TEACHING IN MANY NEAR BY MEDICAL COLLEGESHAVE TO RUN TO HOSPITALS LIKE YASHODA,GANESH,NAGAR,SUDARSHAN,PUSPANJALI,KAILASH,VRINDAVAN ETC TO SEE OUR PATIENTS IN EMERGENCY AND IN SCHEDULE TIME TOO TO PASS THIS JUNCTION IS AHELL SOME TIME TAKES 30-60 MINUTES AND WHEN WE COME FROM SEC 62 SIDE AFTER ATTENDTING ATLANTA,VASUNDHARA,FORTIS,MJS HOSPITAL IT MAY TAKE 2-3 HRS EVEN,SO IT IS URGENTLY NEEDE AND SAME IS CONDITION WITH PATIENTS REFERRED FROM THIS AREA TO THIS HOSPITALS.

THEREFORE PLEASE PAY ATTENTION TO IT URGENTLY AND TRY TO SOLVE THIS PROBLEM AS SOON AS POSSIBLE.

THANKING YOU

YOURS FAITHFULLY

DR.D.R.NAKIPURIA

SENIOR PHYSICIAN

1420 MAHAGUN MILANO TOWER 

CROSSING REPUBLIK

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,


On 8 July 2015 at 14:34, Manmohan Jha manmohan.jha@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in> wrote:
 

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

Manmohan Jha
Crossings Republik
Ghaziabad





--
drn


----------
From: Sunil Kushwaha sunil.kushwaha97@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Fri, Jul 10, 2015 at 1:20 PM
To: dmgbn@nic.in, ceo@gnida.in
Cc: "Xing-Future@googlegroups.com" <Xing-Future@googlegroups.com>, CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, CRIS <crossings-republik@yahoogroups.com>


 

Dear Sir,
please have a look in below mail and kindly provide the solution for the same ASAP as our life is becoming like a hell by daily traffic Jam due bad road condition and unauthorized encroachment on both side of road and rainy season on the top of all.

Thanks,
Sunil Kushwaha
Cosmos Golden Height
Crossing Republik,
Ghaziabad
 
---------- Forwarded message ----------
From: Sunil Kushwaha <sunil.kushwaha97@gmail.com>
Date: Wed, Jul 8, 2015 at 5:57 PM
Subject: Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik
To: authority@gnida.in, upgbn@nic.in
Cc: helplinegda@gmail.co, cmup@nic.in, upgha@nic.in, dmgha@nic.in


Dear Sir,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis t avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.
also we have waste 2-3 hours daily in Jam and also have to spend our hard earned money unnecessary in fuel.

We look forward for any early action on ground.

Regards,
Sunil Kushwaha,
Cosmos Golden Heights,
Crossing Republik,
Ghaziabad



----------
From: Sachin Saxena sachinsaxena_2@yahoo.co.in [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Fri, Jul 10, 2015 at 6:41 PM
To: "CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Cc: "Xing-Future@googlegroups.com" <Xing-Future@googlegroups.com>, CRIS <crossings-republik@yahoogroups.com>


 

Hi,

If in Haryana people can make a huge bridge on their own cost, why can't we take this initiative and repair the road. 

I believe each person living in crossings would be happy to shell out some amount to a smooth commute.
 
Thanks,
Sachin


From: "Sunil Kushwaha sunil.kushwaha97@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA]" <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
To: dmgbn@nic.in; ceo@gnida.in
Cc: "Xing-Future@googlegroups.com" <Xing-Future@googlegroups.com>; CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>; CRIS <crossings-republik@yahoogroups.com>
Sent: Friday, 10 July 2015 1:20 PM
Subject: [CROMA] Fwd: Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik

 
Dear Sir,
please have a look in below mail and kindly provide the solution for the same ASAP as our life is becoming like a hell by daily traffic Jam due bad road condition and unauthorized encroachment on both side of road and rainy season on the top of all.

Thanks,
Sunil Kushwaha
Cosmos Golden Height
Crossing Republik,
Ghaziabad
 
---------- Forwarded message ----------
From: Sunil Kushwaha <sunil.kushwaha97@gmail.com>
Date: Wed, Jul 8, 2015 at 5:57 PM
Subject: Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik
To: authority@gnida.in, upgbn@nic.in
Cc: helplinegda@gmail.co, cmup@nic.in, upgha@nic.in, dmgha@nic.in


Dear Sir,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis t avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.
also we have waste 2-3 hours daily in Jam and also have to spend our hard earned money unnecessary in fuel.

We look forward for any early action on ground.

Regards,
Sunil Kushwaha,
Cosmos Golden Heights,
Crossing Republik,
Ghaziabad





----------
From: Ashish srivastava ec.ashish@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Fri, Jul 10, 2015 at 11:41 PM
To: CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in
Cc: "authority@gnida.in" <authority@gnida.in>, "upgbn@nic.in" <upgbn@nic.in>, "dmgha@nic.in" <dmgha@nic.in>, "cmup@nic.in" <cmup@nic.in>, "helplinegda@gmail.com" <helplinegda@gmail.com>, "upgha@nic.in" <upgha@nic.in>


 

Ashish Kumar Srivastava
Crossings Republik
Ghaziabad.





----------
From: Seemanta Dutta seemantad@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Sun, Jul 12, 2015 at 10:44 AM
To: cmup@nic.in, dmgha@nic.in, upgbn@nic.in, crossingsrepublikownersandmembersassociation-croma <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, "Xing-Future@googlegroups.com" <Xing-Future@googlegroups.com>, authority@gnida.in, "crossings-republik@yahoogroups com" <crossings-republik@yahoogroups.com>, GDA Helpline <helplinegda@gmail.com>, upgha@nic.in


 


Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards

Seemanta Dutta
Panchsheel Wellington
Crossings Republik,
Dundahera, Ghaziabad 
 

 

 


----------
From: BPS BHATIA bpsbhatia1@yahoo.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Sun, Jul 12, 2015 at 11:36 AM
To:
Cc: crossingsrepublikownersandmembersassociation-croma <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>, "Xing-Future@googlegroups.com" <Xing-Future@googlegroups.com>, Manmohan Jha <manmohan.jha@gmail.com>


 



Sent from Yahoo Mail on Android


Date:Sun, 12 Jul, 2015 at 10:44 am
Subject:[CROMA] Repairing and widening of Link Road between ABES cut at NH 24 and Noida Extension through Sahberi Village & Crossings Republik

 


Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards

BPS Bhatia
Panchsheel Wellington
Crossings Republik,
Dundahera, Ghaziabad 
 

 

 


----------
From: Sunil Kushwaha sunil.kushwaha97@gmail.com [CrossingsRepublikOwnersAndMembersAssociation-CROMA] <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>
Date: Wed, Jul 15, 2015 at 11:32 AM
To: authority@gnida.in, dmgha@nic.in, upgha@nic.in, Xing-Future@googlegroups.com, CRIS <crossings-republik@yahoogroups.com>, upgbn@nic.in, cmup@nic.in, helplinegda <helplinegda@gmail.com>
Cc: CROMA <CrossingsRepublikOwnersAndMembersAssociation-CROMA@yahoogroups.co.in>


 

Requesting all authorities to please look into below matter and try to solve it ASAP.
also please let us know if you are looking for any kind of help form us to get it done please let us know.

Thanks,
Sunil Kushwaha
Crossings Republik
Ghaziabad

On Wed, Jul 8, 2015 at 2:34 PM, Manmohan Jha <manmohan.jha@gmail.com> wrote:

Dear Sirs,

This refers to Link Road between ABES cut, Ghaziabad at NH 24 and Noida Extension Passing through Crossings Republik & Sahberi Village. This road is a lifeline for commuter travelling from Ghaziabad & Crossings Republik towards Greater Noida & Noida and vice versa. Further Crossings Republik where approx. 10000 -12000 family lives has only two exit point one through NH 24 & another through Sahberi/Noida Extension. Thousands of vehicle uses this route on daily basis to avoid Jam of NH 24. No. of vehicles using this link road from Ghaziabad Town & Noida is double than vehicles of Crossings Republik using this road.

On several occasion we have approached Authorities in Ghaziabad for this work but we have been told that Sahberi Village falls under jurisdiction of Greater Noida Authority.

This road is a single lane road for the approx. 200 mtr distance. and at some places encroached. Apart from this condition of road is very poor and repeatedly big pot holes comes up on this road. After long follow up by few residents including Mr. Amod Kumar Giri of Crossings Republik work of widening started and also pot holes were filled up approx. 3 month back. However widening work stopped in between after preliminary preparation and was not completed. Also of repairing was so poor that just after one rain bigger pot holes has come up and its nightmare for thousands of people passing this 200 mtr. Stretch as it takes hours to cross this patch.

The bad shape of road through this stretch is not only causing personal loss like health, mental stress, wastage of time & money  but also causing national loss by wastage of fuel. At times travelling through this stretch of 200 mtr. takes more than hour and frustrated commuter starts taking internal routes going through village and township which is making life of residents difficult.

We residents of Crossings Republik hereby request you to advise the concerned department to look into this and arrange for widening and repairing on war footing so that we will get relief from daily pain.

We look forward for any early action on ground.

Regards,

Manmohan Jha
Crossings Republik
Ghaziabad


--
You received this message because you are subscribed to the Google Groups "Xing-Future" group.
To unsubscribe from this group and stop receiving emails from it, send an email to Xing-Future+unsubscribe@googlegroups.com.
To post to this group, send email to Xing-Future@googlegroups.com.
Visit this group at http://groups.google.com/group/Xing-Future.
To view this discussion on the web visit https://groups.google.com/d/msgid/Xing-Future/CAGi4rbcrdtHD90-DD6cuJUvf1eZtvDg1n5UXq5KtkD-uq%2BeA5g%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.






--
Thanks a lot for connecting with me. Pls feel free to discuss and share with me. I am in the field of Debt Syndication and arrange funds for corporate upto Rs. 250 Crore. You May kindly discuss any proposal and refer any client and get benefit of our referral program also.

--
With Thanks and Regards,

Om Prakash Parashar
8802865508

__._,_.___

Posted by: Niranjan Kumar <kumar_niranjan@hotmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (20)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/

[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]

.

__,_._,___