Request all to raise complain addressed to DM , Commissioner (मंडलायुक्त), GDA (विकास प्राधिकरन), शासन स्तर on below. Website.
Sample content for complaint
Sir, Approx. 40k ppl live at Crossings Republik Dundahera Ghaziabad.
It has 3 connecting road,
1st for NH24,
2nd to Noida Extension thru Shahberi and
3rd is exiting to Noida Extension thru RispalGarhi village of Gr Noida.
Story of Nh24 is known to everyone hence maximum ppl of Crossing and ppl fron GZB going to Noida / Gr. Noida and reverse are using other 2 road passing thru Crossing Republik - Noida Extension.
Shahberi road is narrow and congeated & not able to take the load and most of the time it remain jam packed.
Due to jam on Nh24 and Shahberi Road ppl use RichpalGarhi road which is half made. It will be wrong to say road as one need to find way that how to and where to drive.
On this road There is a patch of 50mtr land which is not acquired hence 50 mtr road out of 400 mtr link road Between Gaur City 2, Noida extension and Crossing Republik is pending. As road is incomplete ppl goes through internal road of RichpalGarhi and exit at link road.
This Request is for following
1) Bringing internal road of RichpalGarhi in good shape.
2) Get link road between Indirapuram Public School Crossing Republic and Gaur City 2 including resolution of 50mtr disputed patch.
Recently one of the Resident has complained and got reply from GDA that Crossing Republik is a privately developed township and road work need to be completed by developer I.e Crossing Infrastructure Pvt. Ltd. (CIPL).
However we wish to bring to your attention that even after regular repeated follow up CIPL is not ready to fo anything in this regard I.e. they are not completing road work even on the portion which is acquired and earth fill is already done. In this case GDA being competent Authority should get it done from CIPL instead of just writing that this is required to be done by CIPL like do not have any role.
We hereby request you to advise concerned official of GDA to get this work completed on priority so that Lacs of ppl of Crossing Republik, GZB and Noida, Greater Noida and Noida Extension will get relief.
Posted by: Manmohan Jha <manmohan.jha@gmail.com>
Reply via web post | • | Reply to sender | • | Reply to group | • | Start a new topic | • | Messages in this topic (1) |
http://www.croma.org.in
Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/
[IMP: People posting ads for promotion of their business or of commercial-only nature will be banned/unsubscribed without any warning or clarification]