Dear CROMA Team,
There should be some standard rate through out the all society of crossing for at least for main load charges,
I got shocked to know that 7500 is nominal rate for per KVA, but for us ( Cosmos Golden Heights ) its around 27000 with Tax.(25000+ tax). Nearly 4 times of the the genuine rate.

But we are helpless and paying as per the builder demand, can CROMA team take up this issue as other builder's are also demanding as per their own rule. Now builder should refund the access this amount or load (2KVA at least) should be increased free of cost by builder to compensate.
Hope CROMA will reply on this.

Thanks,
Sunil Kushwaha
Cosmos Golden Heights

CROMA Updates <cromaupdates@gmail.com> wrote:

Dear All Crossings Republik Residents/AOA/RWA/Adhoc Committee Members,


CROMA wanted to bring below two points pertaining to Electricity.

1)      Monthly Fixed Charges being collected by CIPL

2)      Sanctioned Load of each society and payment made for this to CIPL and in turn by CIPL to UPPCL.


1) Monthly Fixed Charges Being Collected by CIPL

All of the Crossings Republik residents are paying monthly fixed charges for the power connection taken by them. Currently this is Rs. 75 Per KVA for the load taken by us. However as CIPL is having limited power load available with them, they are billing to builders on minimum of sanction and peak load drawn by the society every month. At present excess monthly fixed charges is going into the pocket of Respective Builder.

For Example, if in any society in which possession is given for 300 flats, considering 5 KVA load per flat, Total Load: 300 X 5 KVA = 1500 KVA (This will be higher in many society as many resident have taken higher power load.)

(A) The fixed charges being collected by builder: 1500 KVA X Rs. 75/- = Rs. 1,12,500/-

(B) From the Power Load data of different society, we have found that for 300 flats, the sanctioned power load / peak load is less than 500 KVA. Considering 500 as a peak load, the fixed charges paid by the builder to CIPL is 500 KVA X Rs. 75 = Rs. 37,500/-

(C) The Extra Fixed Charges collected by the Builders: (A)-(B) = Rs. 75,000 Monthly (Rs. 250 Per Flat)

(D) Now, per flat excess amount which is going into the pocket of respective builder is: (C)/300= Rs. 250/-

This differential amount should be either refunded or adjusted out of common

__._,_.___

Posted by: sunil kushwaha <sunil.kushwaha97@gmail.com>
Reply via web post Reply to sender Reply to group Start a new topic Messages in this topic (6)
For latest updates do visit official CROMA website at:
http://www.croma.org.in

Also, do register at the CROMA site, if not done already:
http://www.croma.org.in/member-registration/